Ken Mattingly was moved from the assist crew into parallel coaching with Anders as backup CMP just in case Apollo 11 was delayed past its meant July start date, at which level Anders would be unavailable.[59] On arrival at the Vertical Assembly Creating, Every single stage was inspected in https://ambiqmicroinc75307.therainblog.com/26781100/5-easy-facts-about-ambiq-singapore-office-described