Eskom has correctly synchronised Unit 2 with the Koeberg Nuclear Power Station in Cape Town, towards the countrywide grid. The unit was synchronised to the nationwide grid, marking a significant milestone during the Generation Operational Recovery Plan and South Africa’s pursuit of a reliable, cost-powerful, and environmentally sustainable power https://landenfuhvf.designertoblog.com/63545949/eskom-synchronises-koeberg-s-unit-two-into-the-grid