1

The Penmann team finalises comprehensive HVAC refurbishment for Nutricia’s production facility in Liverpool supporting FSI Phase 1 & 2

News Discuss 
Penmann successfully delivered a significant HVAC upgrade at Nutricia’s Liverpool-based production site, supplying a purpose-built ventilation and climate control system engineered to meet strict hygiene and production standards. The scope included the complete lifecycle delivery of high-specification HVAC systems across non-production, Medium Care (MC) and High Care (HC) areas. Based https://mysitesname.com/story10531754/the-penmann-team-completes-specialist-hvac-installation-for-nutricia-s-production-facility-in-liverpool-in-line-with-fsi-phase-1-and-2

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story